Skip to Main Content
Accessibility Information
Porsche.ca My Porsche
Porsche Centre Saskatchewan

Classic Restoration Project

 We are very excited to be a part of Porsche Cars Canada's first-ever Classic Restoration Competition.

Throughout the next year we will be working to restore this Porsche 1956 356 C. 

And keep an eye out for updates on our progress. You can follow the progress here on our website, Facebook, Instagram and any of these #Porsche #PorscheClassic #PorscheClassicCompetition#PorscheCentreSaskatchewan #PorscheofthePrairies#porscherestoration #porsche356


August 29, 2018

Take a look at the video to see our starting point.   

 


September 10, 2018

The Porsche 356 mounted on the car rotisserie.

car motor vehicle vehicle

car

 


October 5, 2018

Technicians at the Porsche of the Prairies are restoring a Porsche Classic 1964 356 C to original specifications for the Porsche Classic Competition.

Check out the blog for more details.

car motor vehicle vehicle

 


October 10, 2018

Here are some pictures of a full booth of Porsche 356 parts. These parts have all the body work completed, primed and painted and are ready for assembly.

The tunnel and floor pans have been welded into the 356.

gym structure

structure

structure product 

Exi Exit

 


October 26, 2018

Floors all squared up and welded into place. This week the tunnel got epoxied from the inside and installed.

And the RH rover inner panel is all installed including the rebuild of all the heater duct tubes.

motor vehicle car

motor vehicle car

motor vehicle car

 


November 19, 2018

Our Restoration continues. This week we got some of quarter panel patches fabricated and welded.

As well as got the b-pillars both repaired and welded.

motor vehicle

motor vehicle

motor vehicle car 48 60 84 Wayne Ha Lae

car motor vehicle

 


November 19, 2018

Check out the video of the engine of the Porsche 356C.

 


November 26, 2018

We have been hard at work making progress on our Porsche 356 Restoration. This week we got the back half of the body buttoned up.

And fabricated the rear quarter front panel from scratch.

car motor vehicle Riot Capital Spees West Sacramen Pennzoil 2 02 Mille

 


December 7, 2018

This week we got the whole back half of the body buttoned up. Exhaust cutouts tabbed and metal finished, bumper slots all re-worked, deck lid fit and gapped. 

We fabricated the rear quarter front panel from scratch and then gapped both doors.

car motor vehicle vehicle

car motor vehicle Raileigh

motor vehicle car Trial

car motor vehicle Exit Eigh Tria Chief Sollne

car motor vehicle

 


December 17, 2018

This week we cleaned up all the needed edges, put it back on the rotisserie and re-sand blasted the full body. Now it is ready for seam sealer and topcoats.

car motor vehicle vehicle

car motor vehicle Jack Daniel

motor vehicle car vehicle

 


 December 21, 2018

 This week we completed the body work on the bottomside of the car including the engine bay and trunk floors.  We then expoxied the bottom for texture coat and primed the engine bay and trunk floors. 

motor vehicle Exit Exit

 motor vehicle car

car motor vehicle

motor vehicle car


 

 December 28, 2018

The bottomside of the car has been texture coated and paint prep has begun on the engine bay and trunk. 

motor vehicle car vehicle

motor vehicle car Sema Show


 January 7, 2019

Meet Wesley Moskwa, the team leader of the Porsche Classic Restoration at Porsche Centre Saskatchewan as he updates us on their progress.  


 January 11, 2019

This week the engine bay, trunk and dash got a splash of slate grey colour.  We assembled the front suspension to factory detail.  


 January 16, 2019

Final colour in the trunk, dash and engine bay.


 January 25, 2019

We completed the bodywork on all panels and refined all the gaps. 


February 2, 2019

This week we finished all the bodywork, masked the car and sprayed polysurfacer on the entire body for blocking. 

 


February 15, 2019

This week some more parts got a splash of black, we masked the body and applied everything in the final primer including doors and bumpers. The car is now ready for final preparation and paint.  


February 19, 2019

Final primer is all done and we're ready to paint! 


February 24, 2019

This week a few more parts got a splash of black and some final prep touches were made. 


February 28, 2019

5 wet coats of Porsche Slate Grey paint have been applied to the body and the doors.  The paint will sit for approximately 4 days and then we will start the wet sanding and polishing process.  


March 7, 2019


March 8, 2019

We had a big week this week!  Three of our team wet sanded the entities of the car down in preparation for polishing. The entire car gets sanded down SIX TIMES by hand in order of 1000, 1200, 2000, 2500 & 3000 progressive grits.  Very labour intensive but also necessary. 


March 9, 2019

The entire car is now buffed in two stages of polishing.  After all of the sanding and then polishing the results are a near mirror glass flat reflection and shine.  


March 15, 2019

Parts have been painted & polished and installed.  


March 22, 2019

This week the interior headliner was installed and the front and rear bumper assemblies. We're not starting to pull much of the car's electrical harnesses back into place. The rear glass was also installed as well as the freshly restored and polished window trim. 


April 4, 2019

It's been a busy week, we've managed to get the windshield installed, dash wrapped in leather and much of the rear interiors carpet and panels installed.  A lot of the electrical is getting close to finalized as well. The red leather and white headliner is a stunning contrast to the slate grey exterior. 


April 12, 2019

The interior is nearly finished, just waiting on the seats.  All the glass and operators are installed with the exception of one quarter window. The original brake calipers were also restored and ready for install. 


April 28, 2019

The remainder of the front detail trims are now installed such as the grills and park lights. The fuel tank is assembled and installed along with much of its plumbing. The rebuilt original calipers and master cylinder were also installed. 


May 12, 2019

The original seats now have their new leather upholstery installed. The rear seats are fully restored and installed as well.  Smaller items like the original shifter and vent levelers have been refurbished. Correct set of 1964 steel wheels have been sourced, media blasted, repaired and painted to the correct shade of silver. Reproduction OE style tires have also been sourced. The engine compartments insulation and sound suppression matting has been completed and detailed. 

Vehicle Car

Land vehicle Vehicle Car

Auto part Automobile pedal Vehicle Car


May 19, 2019

This week we completed the interior seats were assembled and installed. Wipers & steering wheel were restored and installed. The rubber mats and toe boards were all installed as well.  

Land vehicle Vehicle Car


June 1, 2019

This week we completely rebuilt the deck lid grilles and installed them along with the rear badges. Buttoned up a few electrical circuits as well.  


June 25, 2019

The engine is ready to install! 


Isn't she lovey?  

Land vehicle Vehicle W. 1 W ा Ww W Ww Wn Www 166 Vr Www Ny क S Wwww Www A Wwww.w Nmn